Download CSV 42 Topic Groundwater Noise Waste management Air quality Social Biodiversity Waste Management Waste Fire safety Safety Traffic Fire risk More topics All topics Access Access and pedestrian safety Access to lighting fixtures Access/space for construction equipment Accessibility and safety Accident and hazard prevention Additional Adjacent Structures Adjacent buildings Aesthetics Aesthetics (construction phase) Aesthetics / lighting Air Air Pollution Air Quality Air Quality (Dust & Emissions) Air Quality - Dust Air quality / Dust Air quality / Noise Air quality / Transportation Air quality/Noise Ambient Noise Ambient air quality As-built (coastline) Basement Flood Prevention Basement Flooding Basement design and flood prevention Benthic habitat / Sedimentation Biodiversity / Contamination Biodiversity/Vegetation Building Structure Building maintenance Building operation Built Environment Chemical / hazardous substances Chemical handling Chemical hazards Chemicals, Oils and Fuels Coastal environment / sedimentation Coastal protection Community Community & Social Community health Community relations Compensation Complaints Compliance and Monitoring Construction Activities Construction Process Construction Waste Management Construction activities (noise, vibrations, light) Construction waste Construction waste management (operational) Contamination (oil spills) Contamination / Oil Contracts Coordination Critical infrastructure Cumulative impacts Design/Aesthetics Dewatering Dewatering complaints Dewatering-related damages Drag racing strip development Dredge crew and project team Dredged material Dredging boundaries and positioning Dredging operations Dredging waste management Dust Dust & Emissions Dust & emissions Dust and prevention Dust control Ecology Electrical Electrical / Safety Electrical safety Electricity / Equipment Electricity consumption Emergency Emergency Preparedness Emergency contacts Emergency coordinators Emergency equipment Emergency exits Emergency planning Emergency preparedness Emergency procedures (fire, evacuation, first aid) Emergency response Emergency response / spill risks Energy Energy Efficiency & Carbon Reduction Energy and Water Consumption Energy and efficiency Energy and water / utilities Energy and water efficiency / procurement Energy use Environment Environment contamination Environmental Monitoring Environmental Monitoring (costs) Environmental monitoring Environmental protection Environmental sensitivity Equipment Equipment and site organization Equipment maintenance Erosion control Excavation stability Fall prevention Falling objects Financial assurances Fire Fire / Hazard Fire Safety Fire Safety (Operational) Fire Safety / Evacuation Fire and explosion risks Fire emergency evacuation plan Fire prevention Fire protection system Fire risks Fire safety training and drills First aid Flooding Flooding mitigation Floor loading capacity Foundation / Concrete Foundation works Foundation/adjacent structures Fuel and chemical storage Fuel handling Fuel leakage contamination GHG GRM General General construction activities General monitoring General monitoring responsibilities General safety General waste, sewage and hazardous waste Green Space & Landscaping Grievance Grievance Management Grievance Mechanism Grievance handling Grievance mechanism Grievance monitoring Grievance redress Grievance/Communication Grievances Ground Water Quality Ground water quality Groundwater / Water management Groundwater / dewatering Groundwater Contamination Groundwater Protection – Contamination Groundwater Protection – Dewatering Groundwater contamination Groundwater dewatering Groundwater quality Groundwater quality (monitoring) Groundwater/Runoff Groundwater/Soil Groundwater/soil risk HR policy HVAC Maintenance Handling oil, bitumen, tar and hazardous substances Harbour operations Hazard Risk Hazard Scenarios Hazardous Materials Hazardous Substances Hazardous Waste Hazardous materials Hazardous materials / Waste management Hazardous substances Hazardous waste management Hazardous works Hazards and risks Hazards and risks from hazardous works Health & Safety Health & safety Health / Safety Health and Safety Health and Safety of workers Health and safety Health and safety measures Health and safety of workers Hot Works / Lifting / Electrical Hot Works / Scaffolding Human health Impact boundary Impact on nearby residents/pedestrians Impact on soil Incidents (PPE use / accidents) Indoor Air Quality Indoor Air Quality & Health Infrastructure proximity Inspection Tours Inspection and maintenance Institutional Institutional arrangements Labor Labor management Labor welfare Land Landscape Landscape & Visual Landscape / Visual Landscape integrity Landscape integrity / scenery Lifting / Hoisting Littering / aesthetics Local economy Logistics Maintenance / Emergency Protocols Maintenance/operational protocols Management Marine Water Quality Marine ecology (fish & benthos) Marine habitat Marine water quality Marine/groundwater Materials Mechanical equipment Mitigation measures (Table 16) Monitoring Monitoring cost Monitoring framework Monitoring plan Monitoring report format Monitoring reporting Monitoring responsibility Monitoring responsibility and cost Monitoring schedule Mosque and adjacent structures Mosquito Control Mosquito breeding Mosquito control Mosquito growth Nearby buildings Nearby structures Neighbor/community relations Noise & Vibration Noise Level Noise and vibration Noise level Noise levels Noise, Vibration and Disturbance Noise/ Construction Occupational Health & Safety Occupational health & safety Occupational health and safety Oil Oil or fuel leaks Oil spill prevention Oil spill response Oil spills Oil spills / leaks during dredging Oil spills at sea Operating Machinery Operation of machineries Operational energy Operational waste management Overall site maintenance Overall site management procedures Pedestrian / Public Safety Permitting Personal protective equipment Pest Pest Control Pollution Pollution prevention measures Post-construction safety Project management Proximity to high-risk energy sources Public Communication Public Health & Safety Public Safety Public Safety / Security Public communication Public health Public health & safety Public health and safety Public safety Public/Stakeholder engagement Quality of life / social conditions Reclamation design (flood mitigation) Reclamation design (outfall pipes) Recruitment Reef survey Regulatory Compliance Regulatory compliance Reporting Reporting schedule Resource consumption Road safety Roof cleaning methods Roof design and fall protection Safe roof access Safety / Training Safety management Safety supervision Scaffolding Sea Level Sea water quality Seawater quality Secure access to plant rooms Security Sediment control Sediment management Sedimentation Sedimentation and marine water quality Sedimentation control Sedimentation rate Sensitive and MPA Shore protection Shoring / Excavation Site Management Site Safety Site access / safety Site development Site excavation and foundation protection Site facilities Site maintenance Site management Site management procedures Site marking Site preparation Site restoration Site safety Site setup Site signage Slip/trip hazards Social Safeguards Social cohesion Social health Socio-Economic Socio-cultural Socio-economic Socio-economic / Health & Safety Socio-economic / cultural Socioeconomic Soil Soil & groundwater Soil / Erosion Soil Erosion and Land Stability Soil and groundwater Soil quality Soil/groundwater Soil/land disturbance Solid Waste Solid waste Solid waste management Solid waste quantity Space for plant and equipment installation Spill Prevention Spill prevention Spill response Spill response equipment Spillage Spills Staff training Stakeholder engagement Storm Stormwater Stormwater drainage Structural Monitoring (Adjacent Buildings) Structural integrity Structural safety Survey/Footprint delineation Temporary site setup Terrestrial Terrestrial Environment Terrestrial Flora and Fauna Terrestrial environment Terrestrial habitat Topography Traffic & roads Traffic (transport / mobilization) Traffic / Access Traffic / road safety Traffic Flow and Management Traffic and Community Traffic and Transportation Management Traffic circulation Traffic level Traffic management Traffic safety Traffic/utility impacts Training Transfer / Transport Transport Transport / Ferry operations Transport / Traffic Transportation Trees Turbidity Underground utilities Urban Landscape and Infrastructure Integrity Use of chemicals Utilities Utilities (Construction) Utilities / Electrical Utilities / Energy Utility impacts Utility services Vegetation Vegetation / Landscaping Vegetation / groundwater Vegetation and Flora Ventilation Ventilation system Vibrations Visual/Aesthetics Waste / Waste Management Waste / sewerage Waste disposal Waste disposal (construction waste, hazardous waste) Waste generation Waste management (construction) Waste management (ongoing) Waste management (operational) Waste management - hazardous waste Wastewater Wastewater / Sewerage Wastewater management Water Water & sewerage Water Conservation Water consumption Water management Water quality Water quality & sediment Water quality / dewatering Water quality / sedimentation Water resources Water/Energy management Water/Sedimentation Water/Waste Window cleaning methods Window positioning and solar glare Work health & safety Worker accommodation Worker safety Worker training Worker welfare Workforce health and safety Workplace safety Workshop safety Type Compensation Contingency Institutional Mitigation Monitoring OtherClear all
42 commitments from 1 report Grouped by report
Dewatering Dewatering permit shall be taken from URA before any dewatering works.
Responsible —
When Before dewatering begins
Monitoring — Dewatering Neighbouring properties within 100 m radius to be informed before dewatering; 30 m boundary to be considered impact area; properties to be informed 24 hours before dewatering
Responsible —
When Before and during dewatering
Monitoring — Dewatering Dewatering signage to be placed during process
Responsible —
When During dewatering
Monitoring — Dewatering Developer should arrange compensation or provide at least 250 L per day per household for groundwater access difficulties
Responsible —
When During dewatering
Monitoring — Water quality / dewatering Water may be discharged to lagoon or sea; sediment and silt should be filtered before discharge; discharge to lagoon only if dewatering on land would cause harm to the aquifer; water quality results to be submitted with URA approval
Responsible —
When During dewatering
Monitoring — Waste / sewerage If water discharge via existing sewerage system, obtain no objection letter from sewerage service provider and submit to URA for approval
Responsible —
When During dewatering
Monitoring — Dewatering Longest duration of dewatering authorized for 28 days; fee of 500 MVR per day; extensions possible up to 6 months with prior extension request
Responsible —
When 28 days (initial); extensions possible
Monitoring — Dewatering URA can stop or suspend any non-compliant dewatering activity; dewatering permit required prior to works
Responsible —
When During dewatering
Monitoring — Dewatering Obtain island/city council approval before dewatering pipes are laid; monitor and maintain pipes during dewatering and remove after completion
Responsible —
When Before pipe laying; during dewatering
Monitoring — Noise Noisy equipment should be located behind sound barriers or sound absorbers; access/entry points away from noise sensitive areas; maintain buffer between plant and neighbours
Responsible —
When During construction
Monitoring — Noise Operation times limited to 7:00 am to 6:00 pm; if extended, noise level maintained at 35-40 dB (8 h) with 2 h interval; special permit for extended operations
Responsible —
When During construction
Monitoring — Dust Dust screens required to full building height as work progresses
Responsible —
When During construction
Monitoring — Waste Waste & packaging to be transferred to Hulhumale transfer stations; hazardous waste kept separate; avoid keeping waste outside boundary; 2-hour unattended disposal penalties
Responsible —
When During construction
Monitoring — Waste All waste to be stored outside plant boundary; to be transported to waste management facility; if unattended > 2 hours, penalty under Waste Management Regulation 2013/R-58
Responsible —
When Construction period
Monitoring — Safety Site safety measures include barricades, warning signs, PPE, daily safety briefings; first aid kit; safety signs; full PPE; heavy machinery usage precautions
Responsible —
When Construction
Monitoring — Emergency All refueling will be done in allocated area to avoid oil spillages; emergency plan in case of spills
Responsible —
When During refueling
Monitoring — Emergency Fire extinguishers; fire blankets; MNDF-compliant fire alarm and detection; evacuation; assembly area; firefighter access
Responsible —
When Construction
Monitoring — Emergency Emergency plan in case of spill; stop work; coordinate with responders
Responsible —
When During spills
Monitoring — Noise, Vibration and Disturbance Limit noisy works to daytime hours; use well-maintained low-noise equipment; install temporary noise barriers where possible.
Responsible —
When construction
Monitoring — Groundwater Use silt traps/settling tanks before discharge; monitor water quality weekly; discharge only to approved locations.
Responsible —
When construction
Monitoring Weekly water quality monitoring Soil Stockpile excavated soil away from the channel; use concrete flooring or tarpaulins for fuels and chemicals storage; avoid soil contamination.
Responsible —
When construction
Monitoring — Landscape integrity / scenery Erect sign boards; keep site organised; promptly remove waste.
Responsible —
When construction
Monitoring — Fuel leakage contamination Store fuels on impermeable surface; train staff in spill response; keep spill kits onsite.
Responsible —
When construction
Monitoring — Waste Waste segregation; reuse where possible; dispose at HDC approved facility; keep waste logs.
Responsible —
When construction
Monitoring — Air quality Dust from excavation and movement; exhaust emissions. Water spraying of dusty areas; cover trucks; maintain machinery.
Responsible —
When construction
Monitoring — Local economy Employment and income: The project will generate employment opportunities for local communities during both the construction and operational phases. Construction activities will require a range of skilled and unskilled labour, providing temporary jobs and income to workers. Post-construction, the operational phase may create longer-term employment opportunities, contributing to local economic development and improved livelihoods.
Responsible —
When construction
Monitoring — Traffic Construction activities are expected to increase traffic volumes; road closures during casting of foundations and floor slabs will be limited to one lane at a time.
Responsible —
When construction
Monitoring — Utility services Increase in water, electricity and waste management demands; install efficient fixtures; encourage water/energy saving.
Responsible —
When construction
Monitoring — Nearby buildings No building adjacent to site.
Responsible —
When construction
Monitoring — Socio-economic / cultural Advance public notifications; maintain safe pedestrian access.
Responsible —
When construction
Monitoring — Pollution Spill response plan; waste segregation; no direct discharge of wastewater.
Responsible —
When construction
Monitoring — Worker safety Safety training; PPE enforcement; daily toolbox talks.
Responsible —
When construction
Monitoring — Dust & emissions Dust suppression; maintenance of equipment; water spraying while excavating.
Responsible —
When construction
Monitoring — Foundation works Proper shoring; use of experienced operators; engineering controls to prevent excavation collapse.
Responsible —
When construction
Monitoring — Public health & safety Signage; barriers; safe pedestrian routes; maintain access.
Responsible —
When construction
Monitoring — Fire risks Fire extinguishers; no-smoking policy near fuels; electrical safety checks.
Responsible —
When construction
Monitoring — Mosquito growth Weekly draining; no open water storage.
Responsible —
When construction
Monitoring — Dewatering Dewatering start and end time; Amount of water dewatered daily; Log book
Responsible —
When construction
Monitoring During dewatering Groundwater Temperature, Salinity, pH, TDS, EC and DO; From lab analysis
Responsible —
When construction and operation
Monitoring Once every six months (construction) and once per year (operation) Complaints Complaints from neighboring houses/residents; Complaints log book; All complaints should be recorded
Responsible —
When construction and operation
Monitoring — Nearby structures Monitoring neighboring structures; Photos of neighboring structures during construction
Responsible —
When construction
Monitoring — Dewatering Dewatering start and end time; Amount of water dewatered daily; Log book
Responsible —
When construction
Monitoring During dewatering